A parking building that cost 39 billion won

image text translation

(1)KBSII12 Number 0739
(2)Parking building with poor floor cracks in the rain
(3)KBSI12 Wednesday 0739
(4)a train departure guide for
(5)OF ALI
(6)39 billion won parking building…Rainwater Leak in a Month
(7)KBSI12 Wednesday 0740
(8)12 Sua
(9)Voice modulation of parking building operators
(10)There were a lot of complaints asking if we didn’t even clean up the water
(11)Children carry their children on their back because their feet are all wet
(12)There were customers who carried me
(13)The parking lot floor on the top floor cracked even before it opened
(14)Installation of electric vehicle charging facilities outside the building and exposure to rain water
(15)지금 All appearance damage 83
(16)Please.
(17)No. f12 of explosive or flammable substances
(18)I forbid it
(19)Do not use it in case of rain or lightning
(20)Do not arbitrarily disassemble the charger
(21)Place in charger outlet
(22)CHARGING CHILDREN
(23)Charging anyone
(24)if there is
(25)It’s charging
(26)Lug Cable
(27)Gwangju Songjeong Parking Building
(28)Instructions Credit card only
(29)a parking fee
(30)More than 30 minutes by default, 10 minutes
(31)1501 This parking lot is open 24 hours a day Paying the fare through the exit adjustment machine
(32)150000 won.
(33)2 Automatically recognizes the link between hydrogen electric and hybrid administrative networks of environmentally friendly automobiles with less than 1,000cc of light vehicles for the disabled
(34)-50 Aftermath of calling the control room intercom in case of a failure or defoliant patient at a discount group
(35)Han Jae-hyuk, a parking building
(36)There’s a puddle of water and it’s raining a lot
(37)There’s a lot of traffic on the road
(38)I’m also nervous about slipping to the parking lot
(39)”Structure of parking lot steel
(40)Some joint leaks…
(41)Defect repair plan
(42)an official of the Korea Railroad Corporation

!

Leave a Comment