the nation’s largest pool disaster at a cost of 50 billion won.

image text translation

(1)Korea’s Largest Swimming Pool Opens at 50 Billion
(2)Closed indefinitely for the first time in months.
(3)Korea’s Largest Indoor Swimming Pool Suspended
(4)52.4 billion won in sports facilities
(5)Shutdown in 2 months
(6)Lee Minjae mash knncorkr
(7)The situation of the poor construction of Gijang Aqua Park, which flooded two months after its opening.
(8)Jan 12 2023 – Jeonggwan Aqua Dream Park, the nation’s largest swimming pool built at a cost of more than 50 billion won, was closed due to flooding two months after its opening.
(9)It was flooded two months after its opening in June last year and has not been reopened.
(10)External audit confirms that the design and construction of the facility are different but the design itself is wrong.
(11)Also, water leaked from the ceiling and the wall cracked.
(12)Recent Structural Review Service Inspection Results
(13)KBS Busan.
(14)KBS News
(15)7 Even the Rose Garden was demolished…a waste of tax money
(16)a news briefing
(17)Removing the Rose Garden
(18)Aqua Dream Park
(19)Jeonggwan-eup, Gijang-gun
(20)News Briefing SKBS Busan
(21)- The Rose Garden is also an iron crab.
(22)- Removing the Rose Garden
(23)a news briefing
(24)Design strength ratio up to 115
(25)Some components of the applied load.
(26)Reviewed that stability RB1A RG8 RG8RG8B was not able to secure the applied load.
(27)Reviewed as failing to secure stability
(28)- Jangcheol Spider Garden Plot
(29)Excessive garden construction and cooling tower location change are the causes
(30)Kang Young-min, the person in charge of the Busan Gijang-gun Office Life Sports Team.
(31)The rooftop is all problematic. It’s in the history report, so it’s right now.
(32)There seems to be a problem with the dragon story, which had a structural review, even when it was designed…
(33)Gijang-gun conducts precision safety diagnosis this week.
(34)Removing the Rose Garden
(35)Waste of KRW 1.4 billion, including garden construction, demolition and reinforcement work
(36)Unable to use due to violation of the Act on High Pressure Gas Facilities for Ice Rink Construction
(37)- Removing the Rose Garden
(38)Notice of Extension of Closure
(39)Aquard is here to proceed with the repair work. The most scheduled depending on the situation.
(40)an emergency
(41)Later, under the supervision of Gijang-gun Office,
(42)progress
(43)I’ll do it. I’m sending this to you because you’re dissatisfied with the use.Ji
(44)50 billion won worth of sports facility cooling tower was moved. a rift that has formed
(45)In the news that the aqua waste that Gijang-gun in Busan spent more than 50 billion won leaked and the building cracked, Gijang-gun was forced to throw away more than 100 million won in resident taxes, whether it was a rooftop garden or several times. This is Choi Wei-ji’s report.
(46)The ceiling is dead. The pavilion built by the flag.
(47)Jeon
(48)Yes or no 10
(49)
(50)Two months before the completion of the construction, the design was forced to change, create a rooftop garden, and even move the cooling tower to the rooftop, so the floor could not last.
(51)They decided to eliminate the quota again, but more than 1 billion won in taxes were thrown away.

image text translation

(1)Jerry Dad 2023-03-09 1934406870
(2)That’s how Sampoong Department Store collapsed.
(3)Archangel Yukiho 2023-03-0937426170
(4)You’re spending too much tax.
(5)Recommended comments.
(6)JIING 2023-03-10 1398570
(7)Fill my bank account with taxes! It’s not hard.

Acuya, dream bba-kku.

Leave a Comment