TEPCO Releases Video Inside Fukushima Nuclear Power Plant

TEPCO Releases Video Inside Fukushima Nuclear Power Plant


image text translation

(1)The outer walls of the concrete have melted, so you can see the rebars, and they’ve corroded everywhere
(2)There’s a rock of nuclear fuel debris on the floor
(3)This is the first video released at the bottom of a pressure vessel containing nuclear fuel inside Fukushima Nuclear Power Plant 1
(4)The cylindrical concrete structure that supports the pressure vessel, the reactor’s main body, was extensively damaged by the nuclear fuel that flowed down at the time of the accident
(5)Concerns are rising that even the 440-ton pressure vessel could collapse due to continued corrosion
(6)Seo Kyul-ryul, a professor of nuclear engineering at Seoul National University
(7)The contaminated water inside Unit 1 is highly radioactiveIf the reactor vessel sinks at least 100 times more than 10,000 times, a lot of water will flow into the groundwater
(8)Twelve years have passed since the accident, but TEPCO has not even started decommissioning work

image text translation

(1)an official of TEPCO official
(2)Through this shoot, I got a lot of information about decommissioning
(3)More than half of the respondents said the Japanese government’s sewage discharge did not gain the Japanese people’s understanding
(4)Tokyo residents of Obayashi
(5)After the Great East Japan Earthquake, all the people have become sensitive about the Fukushima nuclear power plant, and honestly, I am nervous
(6)Since the 2011 Fukushima nuclear explosion, TEPCO has still not been able to take out nuclear fuel debris from the collapsed nuclear power plant 12 years later
(7)Meanwhile, the Japanese government plans to start discharging contaminated water into the sea soon

httpsnnewsnavercommnewsarticle0520001869951sid=104

Leave a Comment