image text translation
(1)Current Status Unit of Power Self-Supply Rate by Region
(2)Seoul, Gyeonggi, South Gyeongsang, South Jeolla, Busan, South Chungcheong, Incheon
(3) as of 2021
(4)The electricity rate differential system was designed based on the perception that it is not reasonable for non-metropolitan areas that have so-called evacuation facilities such as nuclear power generation to pay the same electricity bill as metropolitan areas that do not
!