GS Engineering & Construction, which has been caught a lot, will correct it quickly

image text translation

(1)The National Land Management Agency’s concrete rebar field inspection is in progress, and a separate report is scheduled when completed. → Headquarters
(2)Defective in 13 out of 14 locations
(3)Inspection results and disposal plan
(4)Channel A report
(5)□ A total of 48 cases were pointed out as a result of the inspection
(6)< GS Construction Site Confirmation Inspection Point Type
(7)Key Points by Type
(8)Safety 10 cases 38 construction 10 cases 38 quality 4 cases 16 other 2 cases 8
(9)Need to remove the lights Need to install the rooftop railing Review of cutting off red alternatives Need to reinstall the wire rope Need to secure floor flatness Need to supplement the safety railing Need to fill holes in the concrete surface
(10)Waterproof layer damage prevention measures required
(11)< GS Engineering & Construction Site Confirmation Inspection Point Type
(12)Major points by type Construction 7 cases 32
(13)4 others 18 safety 8 cases 36 quality 3 cases 14
(14)A total survey of 83 construction sites nationwide by GS Engineering & Construction Co

image text translation

(1)Defect management in 13 out of 14 locations alone
(2)- Title: Re-formation of waterproof gun on underground exterior wall and installation of protective cushioning material is required
(3)Reported by C-channel A
(4)Content GS E&C Co., Ltd. is the order holder at 21826
(5)Construction is underway with the contract price of 313001 million won and the construction of 202191 is scheduled to be completed on 2024731
(6)According to the standard specification KCS 41 40002 asphalt waterproofing construction 384, protective cushioning materials are installed after the underground outer wall waterproofing layer is completed
(7)13 out of 14 inspection sites need to be corrected

image text translation

(1)Defective in 13 out of 14 locations
(2)Channel A report
(3)Kim Kyu-chul, Director of Technical Safety Policy at the Ministry of Land, Infrastructure and Transport, on the 5th
(4)GS E&C’s 83 sites are being checkedWe will announce the inspection results in mid-August

image text translation

(1)Defective in 13 out of 14 locations
(2)Channel A report
(3)Corrective action by field
(4)From the 20th to the 5th of last month, the Ministry of Land, Infrastructure, and Transport in Seoul and the metropolitan area, Daejeon and Chungbuk
(5)Other 6 Safety 18
(6)Quality Overall City Hall
(7)Time and space 17

image text translation

(1)Defective in 13 out of 14 locations
(2)Channel A report
(3)Missing support in roof rail design

image text translation

(1)Defective in 13 out of 14 locations
(2)Point out the possibility of condensation in each generation’s outdoor unit

image text translation

(1)Defective in 13 out of 14 locations
(2)Channel A report
(3)Possibility of plywood collapsing on the floor of temporary construction

image text translation

(1)Defective in 13 out of 14 locations
(2)Channel A report
(3)Punishment of Fines… GS Engineering & Construction Corrects Quickly

image text translation

(1)The government passed on 83 construction sites nationwide under construction by GS Engineering & Construction
(2)We’re conducting an investigation, and 13 of the 14 places that have been inspected are constructed
(3)We’ve got a bunch of bad news and safety management issues
(4)Kim Kyu-chul, Director of Technical Safety Policy at the Ministry of Land, Infrastructure and Transport, on the 5th
(5)GS E&C’s 83 sites are being checked We will announce the inspection results in mid-August
(6)A total of 48 points were pointed out in 14 places, including 12 apartments in Seoul, Daejeon, and Chungcheongbuk-do
(7)18 safety issues, 17 construction failures, and 7 quality issues were detected
(8)At an apartment construction site in Gyeonggi-do, which is scheduled to be completed in July next year, the roof railing design is missing support, and the railing may be shaken by strong winds
(9)Every time a construction site conducts a regular safety inspection, a report of the results must be submitted to the Minister of Land, Infrastructure and Transport

image text translation

!

Leave a Comment