A gymnasium in Buan-gun, Jeollabuk-do, built with 11.9 billion won.jpg

image text translation

(1)News Desk
(2)I built it at 11.9 billion won…a leaky gym
(3)Rainwater leaky 11.9 billion gyms
(4)Buan Bandabi Sports Center
(5)the last seven days
(6)Buan-eup, Buan-gun, Jeollabuk-do
(7)Rainwater leaky 11.9 billion gyms
(8)MBC News Desk
(9)a sports center user
(10)It was very smooth, but it was a trash can now, but I cleaned it up… That’s how it is. It’s serious
(11)Sports facilities for the disabled and non-disabled
(12)Leakage from the first year of operation
(13)consignee official
(14)I’m cleaning it up from time to time. Since the floor is slippery
(15)Late repair work due to falling finish material

image text translation

(1)Jeonbuk’s first ball used by both disabled and non-disabled people
(2)The public sports facility opened in Buan last March
(3)It cost 11.9 billion won to build it
(4)It’s only been four months since it opened, and there’s already been rainwater dripping and no essential facilities for the disabled, such as braille blocks, have been installed
(5)Reporter Jeong Ja-hyung covered it
(6)Right after the rainy season, I went into a sports facility in Buan County
(7)Raindrops dripping from all over the ceiling
(8)The staff comes out and hurriedly wipes the floor
(9)The stairs leading up to the second floor are dark gray, wet, and some have turned black due to water stains
(10)Whenever it rains, I have to take out the water bottle
(11)a sports center user
(12)It was so smooth. It was like a trash can
(13)I cleaned up all the cylinders. It’s serious

image text translation

(1)It turns out that Buan-gun here has been paying national expenses since 2020
(2)The Bandabi Sports Center, which was built with 11.9 billion won, was officially operated in March
(3)It is the first sports facility in Jeollabuk-do that uses both the disabled and the non-disabled, and is so popular that an average of 100 people visit it a day
(4)However, since the first year of operation, there have been a series of complaints due to leaks everywhere
(5)a consignee official
(6)I’m cleaning it up from time to time. Since the floor is slippery
(7)It wasn’t the only problem
(8)It’s a space where disabled groups live
(9)Despite the frequent visits by the disabled, no handles or braille blocks have been prepared yet
(10)Buan-gun is carrying out repair work in the winter, saying that the outer wall finish did not harden and fell off, causing a leak
(11)Braille blocks and handles for the disabled were not pointed out at the time of the review, so I thought there was no problem, and he explained that he would secure the budget and install them later

httpsnnewsnavercomarticle2140001284580sid=102

Leave a Comment