Announcement of the results of the LH total survey Additional confirmation of missing rebar in 15 complexes철근WSNEWS

image text translation

(1)Subscribe to Yonhap News Agency
(2)There were more apartments without reinforcementChecked LH 15 complexes for missing piles
(3)Input 20230730 PM 347 Modified 20230730 PM 348 Article ID
(4)Reporter Park Cho Rong
(5)1st Giga ②
(6)As a result of a total survey of 91 complexes applying the underground parking lot structure, the underground parking lot collapsed and the same structure as Incheon Geomdan Apartment
(7)- Seoul Regional Headquarters
(8)Ministry of Land, Infrastructure and Transport
(9)Minister Won Hee-ryong, who bowed his head, and LH President Lee Han-joon
(10)Seoul = Yonhap News Reporter Park Dong-joo = Land, Infrastructure and Transport Minister Won Hee-ryong and LH President Lee Han-joon apologized for the occurrence of tap water in Siheung Eungye District before an emergency safety inspection meeting for public housing held at LH Seoul Regional Headquarters on the afternoon of the 30th

The results of a full investigation into the underground parking lot with no plate structure are announced

Construction company’s rebar has been found to be missing in 15 complexes. Reinforcement work begins

The rest of the parts, the rest of the construction, didn’t happen

기사전문 httpsnnewsnavercommnewsarticle0010014101485rc=Nntype=RANKING

Leave a Comment