The construction company misread the drawing, and the rebar that will go into the ceiling is on the floor

image text translation

(1)The contractor misread the drawing on the ceiling
(2)The rebar to go in is on the floor
(3)KIM HYUNG WOO INPUT 2023871622 MODIFIED 2023871643
(4)▼ 1A is
(5)LH revealed a briefing session before reinforcement of the negative gold stone apartment
(6)We’re working on reinforcement, but there are a lot of questions about whether the residents can trust us

a construction company that can’t even read the drawings

a blind supervision

It’s not a problem because it’s constructed somewhere. LH

It makes my heart race

[Laughing] [Laughing]

Leave a Comment