Japan’s 90 trillion Shinkansen Update

Chuo Shinkansen or

a linear Shinkansen

It’s a magnetic levitation train

I’m going to run on wheels up to 150kmh

If you go over, you fold your wheels and run in the air

The current operating speed is 505 kmh

It will be increased to 800 kmh after opening

when it opens

40 minutes from Tokyo to Nagoya. 95 minutes from the current Shinkansen

Tokyo to Osaka 67 minutes; current Shinkansen 144 minutes

I almost lost my breath here, too

JR Tokai who makes that

I don’t get any support

Article 90 Flex. It’s a domestic product

I ignore all the demands because I have to make it in a straight line

The existing Tokaido Shinkansen line line is also a winding plate

I can’t even speed up properly

You can’t even make a new one

Ignoring all the demands and almost straightening them out

Even in Kansai, Kyoto is excluded

It’s made of passing by a country

The rate hasn’t been fixed yet

Tokyo to Nagoya is 700 yen compared to the existing Shinkansen

Tokyo to Osaka is planned at around 1,000 yen

Tokyo to Nagoya scheduled for 2027

Nagoya to Osaka is scheduled for 2037

Let’s make it too lol

Leave a Comment