a new apartment that no one will move in for five months after completion of construction

image text translation

(1)○○-eup, Seogwipo-si
(2)A 10-story building in Seogwipo City
(3)It’s a new residential and commercial apartment
(4)Even though it was approved for use last July
(5)No one has moved in
(6)I entered the building with the guidance of the developer
(7)The ceiling of the room was exposed to concrete
(8)Between the wall and the door frame
(9)It’s the bathroom
(10)Unlike the original design, there’s a door on the other side
(11)Defect maintenance check
(12)The wall is tilted and not vertical
(13)I paid a down payment of 120 million won
(14)Mr. Kim, who was going to move in
(15)It was worse at the time of approval
(16)Defect maintenance check
(17)C finish failure contamination
(18)Finishing Molich
(19)Mr. Kim’s water quantum
(20)At that time, I even had a back or sprinkler on top of it
(21)These aren’t installed either
(22)It’s weird that it can be approved for completion
(23)5 months prior to approval of use
(24)It’s another house in a residential and commercial complex
(25)The walls and floors are covered with concrete
(26)It’s not finished
(27)There’s no fire alarm
(28)Caption news
(29)Appended Form 2 20210625 of the Enforcement Rules of the Building Act
(30)on a monthly basis in
(31)Use approval investigation and inspection report
(32)Seocheon City Japan Government Research Group marks the date of the annual permit number 2019-Architecture Division-Investigation Inspection Inspection
(33)This is benign
(34)Yes, permission date 2019
(35)In accordance with Article 27 of the Building Act and Article 21 of the Enforcement Regulations of the same Act, a usage approval investigation and inspection report shall be submitted as follows
(36)Even so, the authorization report says
(37)TY diary of party sponsorship
(38)a branch of a building line
(39)Details of Form 24 Investigation: Building to prevent crime of structural underground structures under the construction site in the building quality control room of the exterior wall finishing materials of the building
(40)Material
(41)Building Act 32
(42)Current status after completion of construction Article 52 of the Building Prevention Article 52-4 of the Building Act Article 52 of the Building Act M Unmatched and temporarily bagged N whether it is not applicable or not. N Match 1 Not applicable
(43)Crime Prevention Use Restriction of Construction Restriction of Korea, etc. Construction of a building in the Doji-gu shall be restricted to the height of the building by the boundary line of the adjacent area, which is a distance from the building line of the floor area ratio of a stone garden building
(44)1 Realization
(45)Well.
(46)Article 53 of the Building Act Article 53-22 of the Party Industry
(47)Poetry
(48)a match
(49)Article 76 of the Act on the Promotion of City and Military Planning 60 Urban and Military Planning Article 2500
(50)lack of confidence
(51)Not applicable for
(52)Article 58 of the Building Act, Article 58 of the Building Act, to secure artificial parts limited in height from the separation distance
(53)Will it match M
(54)It says that all items are suitable
(55)Matching Emergency Elevator M
(56)There’s also KBS in Seumteo wwwwaiisgokr
(57)■ Attached Form 22 of the Enforcement Rules of the Building Act
(58)a supervision report
(59)The first of the three Sacks should be submitted along with the application for approval of use and marked where appropriateInterim Report on Application Classification – Building Division – Seogwipo City Self-Governing Province Special for New Construction Permit
(60)Re-completion report V
(61)December 10, 2019
(62)My
(63)Name and number
(64)Construction of Finished Reinforcement Work
(65)Completed roof slab arrangement
(66)The same is true of the report on the completion of supervision prepared in June
(67)Formwork or cornerstone installed
(68)Article 40 of the Building Act
(69)Group 1 and 4
(70)Nonconforming for applicable business
(71)the Construction Act
(72)Top fit V corresponding businesses
(73)Fitting
(74)Article 4215 of the Building Act
(75)Not applicable for ordinance nonconformity
(76)」제 적합
(77)Article 47 of the Building Act Article 46 of the Building Act does not apply
(78)V
(79)The developer considered this strange and tried to find out how it happened
(80)NAODS 24A454 BAKENUZUN MENG AND AREAD Even strong male students established their impressions of using it in advance. I am the first commercial to save NA HOUDEKA’s products as possible384H NEGE 32499 SA 44926OREN WAND
(81)The test, such as stir-frying the AVOVE WE HETSHOE AVEE order, has no choice but to slow down the sense of appreciation due to the continuous correction of the region of NY CONVERTER HE HANN University. It is a shame that we cannot win 24 SHARES. 444 E APEN2 2084 E-type economic reader is ordained
(82)I’ll protect the former of reduction
(83)Due to the tacit pressure of the contractor from the supervisor, the ㅆ Government’s Jamak News has failed to comply with the deadline for completion of responsibility, and in the case of Kim Ha-hal, there is no choice but to feel tacit pressure on the continuous request of existing construction
(84)I’m going to experience the police
(85)At that time, there was a class difference index when the article was used, but 2024ARKS AND ISA SAP UN SUDAN ANNEL
(86)Fruit pancake
(87)ㅜ is
(88)Buy
(89)Dragon
(90)Approval
(91)under one’s belt
(92)Exchange
(93)HAMMERSHIP
(94)request
(95)Ji
(96)It’s
(97)Wealth
(98)Caption news that the U.S. corporation wrote it in an incomplete state
(99)I’ll give you some credit with a desperate request to be a contractor
(100)to make a promise
(101)We are concerned about damage such as the failure to receive a contractor as the representative of this project and the failure to receive a contractor as a result of the continuous request to take over PF loans using non-Korean families and situationsAt that time, the construction company was in a condition such as the construction of a small number of internal sea badges within some households that were not partially completed, but the construction company
(102)After that, I’ll be 20 years old
(103)I’m going to fill it out and write a letter
(104)Completion report
(105)To gain
(106)Failure to receive supervision fees on the condition that construction and completion are made in accordance with the Act and subordinate statutes
(107)I’ve gained a lot of people
(108)It was done, but it’s only for the user
(109)He said he received a statement
(110)Trust me and submit a complete report
(111)Certificate of confirmation of deposit for supervision fee and supervision
(112)a board of supervisors
(113)There’s a certificate and submission system
(114)It wasn’t enough, but the patent for use is still not under construction
(115)Therefore, we obtained approval for use on 07/07/07/07/2002 when confirming the deposit of the supervision feeOur company is a contractor who said that the construction will be partially carried out at that time
(116)trust the supervision completion report
(117)and a seller who did not expect damage to the developer
(118)I’ll do my best not to cause any damage to the developer
(119)(120)The person who is in charge of the investigation
(121)I heard that there was a lack of construction
(122)”Although there were some parts where I didn’t finish the construction work
(123)a telegram of move-in
(124)I want you to complete the construction before you move in
(125)Notification of completion of construction before moving in
(126)He said he notified the contractor
(127)a representative of a developer
(128)Despite poor construction, the first-tier contractors
(129)The act of concealing it, of suppressing the weak
(130)I hope there won’t be any actions
(131)the contractor’s side
(132)The contractor said
(133)”The construction hasn’t been completed yet.”
(134)Creating a Report
(135)without completion of construction
(136)”The construction is not over yet.”
(137)The report has never been small
(138)You said you didn’t make me write the report
(139)per user
(140)a fully tenable award
(141)sufficient occupancy at the time of approval of use
(142)At the time of approval for use, it was available to move in
(143)enough
(144)He countered that he was in a possible state
(145)I’ll fly to the future together, Jeju
(146)I’ll take the job to the architect’s office
(147)Seogwipo City Hall
(148)Seogwipo City, which gave approval for use
(149)Now we’re trying to figure out how it happened
(150)If Jung Yoon-mi, the head of the Seogwipo City Housing Team, says it was reported as false
(151)Jung Yoon-mi, the head of the housing team in Seogwipo, asked the supervisor and the agent of Hae
(152)the History of Architecture Act
(153)Jung Yoon-mi, the head of the housing team in Seogwipo, plans to file a complaint
(154)In the meantime, I dreamed of buying my own house
(155)The 29th generation of pollinators can spend up to 100 million won per generation
(156)I lost the down payment
(157)The trust didn’t pay the balance
(158)I’m going to send you two top cards
(159)Mr. Kim just canceled the contract
(160)My dream of moving to a new place is gone

!

Leave a Comment